Bathroom remodeling
What should happen before tile goes into a rebuilt shower?
Before tile, identify the complete waterproofing assembly, its connection to the drain and the method for checking the finished base. Ask the installer to describe the selected system and record required checks while seams, corners and penetrations are still visible.
Choose the system before buying trim
Drain style, curb height, tile format and the wall system affect one another. A linear drain on a drawing is a different commitment from a center drain under an existing floor. Have the installer confirm the drain and waterproofing components work together before the designer finalizes the tile layout.
Review seams, corners and fixtures
Niches, benches and pipe penetrations introduce changes in plane. Ask to see how those details fit the selected waterproofing method. Keep the model numbers and photos with the scope so the replacement trim and shower enclosure can be coordinated later.
Record the pre-tile check
The test method and timing follow the system instructions and applicable inspection requirements. For example, Schluter describes testing its shower base before tile to check for leaks. Ask the installer who will perform the relevant test, record the result and release the next stage.
Schluter · Shower water testingBefore authorizing tile
- Drain and waterproofing system identified
- Penetration and niche details reviewed
- Applicable checks and inspections completed
Related guides

