New flooring
When is the subfloor ready for new flooring after a leak?
New flooring can go in once the source of moisture is fixed and the surface beneath the floor meets the flooring and adhesive manufacturers’ requirements. The finish material, the condition of the subfloor or slab, and the moisture readings all affect that decision.
Identify every layer that got wet
A bathroom doorway may expose tile, underlayment and plywood while the adjoining hallway sits on a concrete slab. Ask which layers got wet and can be examined. Have the installer identify soft plywood, swollen edges, loose underlayment and other areas that need attention before a new floor covers them.
U.S. EPA · Drying a flooded homeMatch the check to the installation
Bring the actual flooring and adhesive instructions to the site visit. Ask what moisture test and surface preparation they require for this substrate and who will record the results. Wood subfloor and concrete can require different tests. Ask the installer what result is acceptable for the product you selected.
Plan for the doors and transitions
A new underlayment or different tile thickness changes finished height. Measure thresholds, appliance openings and the bottom of each door before ordering. If the room meets undamaged flooring, decide where the edge will finish and how the transition will look and feel.
Ask for the installation record
- Substrate and product identified
- Required tests and results recorded
- Repairs and transition heights agreed
Related guides

